The HRP system demonstrated excellent reliability, low maintenance requirements, and strong performance in a high-deviation CSG application, supporting stable production across a wide turndown range.
Read the full testimonial
Installed on a Yellowbank pilot well — a horizontal coal seam gas well (~80° deviation, DLS up to 10.37°/100 ft) — for dewatering. Online July 2023, it ran continuously for ~13 months; the well was shut in only because the pilot concluded, not due to any equipment limitation.
Rod pump set at 3,258 ft MD (2,415 ft TVD) in 3-1/2" tubing, driven by a 240" stroke HRP with an H100 Genesis power unit. Production rose from ~50 BPD to 130 BPD and was drawn down to pumped-off conditions at ~25 BPD.
The reduced downstroke velocity improved rod fall and significantly minimised rod compression, buckling and side loading. Gas was produced through the pump while maintaining strong pump efficiency, attributed to the higher compression ratio of the long stroke.
The fully enclosed stuffing box performed as designed with zero wellbore fluid leaks, and the HPU needed only routine filter changes and hydraulic oil top-ups.