HRP Australia
Extended Well Test

Prove the well on rod lift — before the permanent build.

A semi-portable HRP package installs in hours with no civil works. Put the well on pump, measure what it really delivers, then convert it to a permanent installation or move the unit to the next well.

~4 hrsInstall & commission
0Civil works
10–1,500BPD range
0.05–3.5SPM range
Why Test First

Real production data before you commit capital.

An extended well test answers the questions a short flow test can't: how the well behaves on artificial lift over weeks or months, and what permanent equipment it really needs.

Prove deliverability

Run the well on pump long enough to see stabilised rates and drawdown before investing in permanent surface facilities.

Size the permanent lift on data

Use measured rates, dynocards and fluid levels to select the cylinder, power unit and downhole pump for the long term.

Lower the risk

No slabs, piling or civil contractors to mobilise, so a test well that disappoints costs far less to walk away from.

The Test Package

Built to move from well to well.

Semi-portable, no civils

A compact cylinder on the wellhead and a skid-mounted power unit. No concrete slabs, piling or civil works.

Fast installation

The cylinder installs in about an hour, and the complete package is typically installed and commissioned in around 4 hours.

Wide operating range

Strokes from 60" to 336", production from 10 to 1,500 BPD, and SPM from 0.05 to 3.5, adjusted on the fly as the well responds.

Live test data

Live and historical dynocards, pump fill, fluid level and trends, monitored locally or through remote web access.

Power where you are

Run the power unit from an electric motor or a gas or diesel engine, or from a genset where there is no grid supply.

Modular sizing

The cylinder and downhole equipment can stay in the well while the power unit is changed after commissioning to suit the rates you find.

Test Data

See every stroke while the test runs.

The HRP pump controller records what the well is doing, so the test produces data you can design from.

  • Live and historical dynamometer cards
  • Pump fill against a target, with automatic pump-off control
  • Trends: SPM, polished rod load, oil level and temperature, amps and volts
  • Fluid level monitoring
  • Local and wireless access, with remote web-based monitoring
The HRP controller HMI running live during operation.
How a Test Runs

From well selection to a decision.

01

Design

Well simulation, rod pump selection, rod string design and surface unit selection.

02

Install & commission

On-site installation and commissioning, typically within a day.

03

Test & optimise

Run the well, review performance and adjust SPM and pump fill as it responds.

04

Decide

Keep the unit as the permanent lift, resize the power unit, or move the package to the next well.

FAQs

Extended well test questions.

How long does installation take?

The cylinder installs in about an hour and the full package is typically installed and commissioned in around 4 hours, with no civil works.

Can the unit stay on the well after the test?

Yes. If the well performs, the same cylinder and downhole equipment can stay in place as the permanent lift. The power unit can be changed to suit the production rate.

What rates can it test?

From 10 to 1,500 BPD, with strokes from 60" to 336" and SPM from 0.05 to 3.5.

What if the site has no power?

The power unit can be driven by a gas or diesel engine, or run from a genset.

Planning a well test?

Tell us about the well and we'll come back with a test package and lift design.

Contact HRP Australia