HRP Australia
Coal Seam Gas

Long-stroke rod pumping, built for CSG.

No civil works, low visual impact, better solids handling and stable fluid levels at very low SPM. Convert CSG wells from PCP to SRP in around four hours.

240"/336"Stroke, no civils
~4 hrsPCP-to-SRP conversion
0.05Minimum SPM
1,100 BPDGalilee Basin CSG well
SRP Driver for CSG

Key advantages for coal seam gas wells.

CSG wells demand stable fluid levels, good solids handling and fast, low-impact deployment. HRP was engineered for exactly that.

01

Long stroke, no civils, low visual impact

240" or 336" stroke without any civil works. Long strokes improve rod harmonics and reduce compression, wear and tear — in a far more compact package than comparable long-stroke units.

02

Better solids handling

A longer stroke lifts solid particles higher up the barrel and tubing each stroke, keeping solids in suspension longer between strokes.

03

Consistent stroke velocity at very low SPM

HRP doesn't rely on a VSD to set SPM, so it maintains effective stroke velocity even at very low rates — critical for sustaining minimum lift velocities while keeping fluid levels stable.

04

Convert wells to SRP faster

Installation and commissioning typically take around 4 hours, eliminating delays from civil contractors and construction crews when converting wells from PCP to SRP.

HRP long-stroke cylinder installed on a Queensland CSG well
An HRP long-stroke cylinder installed on a Queensland CSG well.

Fully sealed stuffing box

Fully sealed yet field-serviceable — prevents environmental leakage and improves uptime.

Easy, low maintenance

All serviceable components are accessible from ground level, with years of operation before major service.

Highly flexible turndown

Reduce SPM to near-zero without the conventional 1-SPM limit — continuous operation without start-stop cycling.

Higher production with insert pumps

Up to 700 BPD on 3-1/2" tubing and up to 420 BPD on 2-7/8" tubing.

Low SPM & Solids

Why stroke velocity matters in CSG wells.

On other rod pump drivers, slowing the SPM slows every stroke. As plunger velocity drops, solid particles that were held in suspension fall and settle in the pump, which can cause a downhole pump failure.

HRP changes SPM by adjusting the dwell time between strokes. Each up and down stroke keeps the velocity set by the operator, so the plunger moves just as fast at low SPM as at high SPM and solids keep moving out of the pump.

Because SPM doesn't depend on a VSD, the unit can run at very low rates, down to 0.05 SPM, while sustaining minimum lift velocities and keeping fluid levels stable.

Stroke velocity vs SPM

Plunger velocity SPM → solids settle HRP — constant Conventional unit
Installations

Proven in Queensland's CSG fields.

From the Galilee and Bowen basins to the Surat and Moranbah, including a 78° deviated well.

HRP installation, Galilee Basin QLD (CSG well)

Galilee Basin

CSG
Stroke
Production
336"
1,100 BPD
Pump depth
Region
1,000 m
QLD
Installed Dec 2020
HRP installation, Surat Basin QLD (CSG well)

Surat Basin

CSG
Stroke
Production
240"
300 BPD
Pump depth
Region
710 m
QLD
Installed May 2021
HRP installation, Surat Basin QLD (CSG well)

Surat Basin

CSG
Stroke
Production
240"
200 BPD
Well
Region
78° deviated
QLD
Installed Jul 2023
HRP installation, Moranbah QLD (CSG well)

Moranbah

CSG
Stroke
Production
240"
250 BPD
Pump depth
Region
679 m
QLD
Installed Nov 2022
HRP installation, Bowen Basin QLD (CSG well)

Bowen Basin

CSG
Stroke
Production
240"
95 BPD
Pump depth
Region
907 m
QLD
Installed Jun 2024

All installations

See the oil and gas wells too, plus HRP's USA track record.

View all
Testimonial · Denison Gas

13 months in a horizontal CSG well, with no downhole failures.

HRP unit at the Denison Gas well site
The HRP system demonstrated excellent reliability, low maintenance requirements, and strong performance in a high-deviation CSG application, supporting stable production across a wide turndown range.
~80°Horizontal CSG well
13 moContinuous, no downhole failures
0Downhole & surface issues
Read the full testimonial

Installed on a Yellowbank pilot well — a horizontal coal seam gas well (~80° deviation, DLS up to 10.37°/100 ft) — for dewatering. Online July 2023, it ran continuously for ~13 months; the well was shut in only because the pilot concluded, not due to any equipment limitation.

Rod pump set at 3,258 ft MD (2,415 ft TVD) in 3-1/2" tubing, driven by a 240" stroke HRP with an H100 Genesis power unit. Production rose from ~50 BPD to 130 BPD and was drawn down to pumped-off conditions at ~25 BPD.

The reduced downstroke velocity improved rod fall and significantly minimised rod compression, buckling and side loading. Gas was produced through the pump while maintaining strong pump efficiency, attributed to the higher compression ratio of the long stroke.

The fully enclosed stuffing box performed as designed with zero wellbore fluid leaks, and the HPU needed only routine filter changes and hydraulic oil top-ups.

CH
Chris HolmesVP Exploration & Development, Denison Gas
Water level, water rate and gas rate over the first 330 days of operation
Yellowbank pilot well, first 330 days of operation: water level, water rate and gas rate (Denison Gas).
HRP unit at the ADZ Energy Pty Ltd well site
In operation since 2020, the HRP has provided reliable, low-maintenance operation, proving itself as a robust and trusted solution for our well operations.
99%Uptime
6,791 ftPump set depth
5+ yrsSince Dec 2020, no major servicing
Read the full testimonial

Installed on ADZ's deep gas well (MC3) since December 2020, the unit has run steadily at 0.5–1 SPM, unloading 15–20 BPD of liquids with 99% uptime.

To date no major servicing has been required — no hydraulic pump replacement, valve change, hose replacement or cylinder change — and operator visits have been minimal, with long intervals between.

"The team at HRP has been very supportive to our operations throughout the years and are always available when needed, both onsite and in our offices."

WR
Wayne RichardsGM – Upstream Projects, ADZ Energy Pty Ltd
FAQs

Coal seam gas questions.

How quickly can a CSG well be converted from PCP to SRP?

Installation and commissioning are typically completed within about 4 hours, with no civil works, so wells can be reactivated much faster.

Does HRP work in deviated and horizontal CSG wells?

Yes. Denison Gas ran a 240" HRP for about 13 months in a horizontal CSG well with ~80° deviation, with no downhole failures. The reduced downstroke velocity improved rod fall and minimised rod compression, buckling and side loading.

How does it handle coal fines and solids?

The long stroke lifts solids higher up the barrel each stroke, and the constant stroke velocity at low SPM keeps them suspended instead of settling in the pump. Slotted intake screens are also available.

What production rates can it handle?

With insert pumps, up to 700 BPD on 3-1/2" tubing and up to 420 BPD on 2-7/8" tubing. Queensland CSG installations range from 95 BPD to 1,100 BPD.

Can capacity be changed later?

Yes. The cylinder and downhole equipment can stay in the well while the power unit is changed to suit the production rate.

Converting CSG wells to rod lift?

Share your well data and we'll come back with a lift design for your field.

Contact HRP Australia