In operation since 2020, the HRP has provided reliable, low-maintenance operation, proving itself as a robust and trusted solution for our well operations.
Read the full testimonial
Installed on ADZ's deep gas well (MC3) since December 2020, the unit has run steadily at 0.5–1 SPM, unloading 15–20 BPD of liquids with 99% uptime.
To date no major servicing has been required — no hydraulic pump replacement, valve change, hose replacement or cylinder change — and operator visits have been minimal, with long intervals between.
"The team at HRP has been very supportive to our operations throughout the years and are always available when needed, both onsite and in our offices."