HRP Australia
Offshore Marginal Fields

Bring shut-in offshore wells back to production — without a rig.

Many offshore wells are shut in because a workover to install artificial lift costs too much, not because the reservoir is finished. A compact, rig-less HRP package makes these marginal and late-life wells economic again.

1.7×1.7 mHPU footprint
~5 TCrane capacity
4–6 hrsInstallation
0Tubing pulls
The Challenge

Producible wells sit shut in.

Marginal and late-life platform wells lose rate as reservoir pressure declines, and the cost of reactivating them keeps them offline.

Why production fails

  • Declining reservoir pressure, falling rates and unstable flow
  • Liquid loading stalls or stops gas wells
  • Wells become uneconomic to produce and operate

Why wells stay shut in

  • Reactivation requires high-cost intervention
  • Workover cost to install alternative lift
  • Surface infrastructure requirements and cost

Why beam units don't fit

  • Limited deck space on platforms
  • Weight and crane capacity constraints
  • No grid power at remote locations
The HRP Offshore Package

Compact surface drive. Rig-less downhole. Unmanned operation.

HRP hydraulic power unit and long-stroke cylinder on a platform deck
1.7 × 1.7 mHPU footprint
~5 TPlatform crane capacity required
4–6 hrsTypical installation time
2 wellsDriven from one HPU
10–1,500BPD production range
336"Maximum stroke length

Rig-less intervention

A rod-retrievable insert pump and J-lock insert pump anchor run into the existing tubing, so there's no tubing pull and no rig workover.

Minimal deck space

An all-in-one 1.7 m × 1.7 m HPU, and a 240" stroke within an 8 m envelope. It lifts with a ~5 T platform crane.

Unmanned operation

Remote and local monitoring, automatic pump-off control, dynocards and built-in sensors, trips and alarms.

Surface barriers

A sealed stuffing box with total surface containment and a fail-close isolation valve, plus a rod lock BOP as the primary surface barrier.

Flexible power

An electric motor or engine, or a genset where there's no grid power. Low energy demand and no gas dependency.

Fast installation

The cylinder installs in about an hour and the full package in roughly 4–6 hours, with no slabs, piling or civil works.

Maximum drawdown

Pumps near-dry, handles high GLR, and runs stable at ultra-low SPM for late-life wells.

Specialty downhole pumps

Gas and solids handling, heavy crude, hybrid tubing pumps up to 1,500 BPD, double-displacement (+30–35%) and sand control screens.

Comparison

HRP versus gas lift and ESP.

Built for marginal wells, the HRP package needs no lift gas, uses little power and needs only rods and an insert pump pulled for intervention.

FactorHRP SRPGas liftESP
Late-life / low rateStable at ultra-low SPMWeak; liquid loadingUnstable at low intake
DrawdownVery high; pumps near-dryLimitedLimited by cavitation / gas lock
InstallationSimple surface packageMandrels + compressionRig, cable, motor, VSD
InterventionPull rods + insert pump onlySlickline valvesWorkover
Gas dependencyNoneCriticalNone
Power / infrastructureLow energy, minimalCompressors + fuel gasHigh electrical demand
Solids toleranceHighModerateLow–moderate
TurndownWide (SPM, stroke)LimitedLimited
Reliability (late life)HighModerateLower (gas + solids sensitive)
HRP cylinder installed on an offshore production platform
An HRP cylinder in service on an offshore platform.
Our Approach

Three steps to reactivate a shut-in well.

01

Screen the candidates

Identify shut-in and late-life wells where declining pressure or liquid loading has stopped production.

02

Install without a tubing pull

The rod-retrievable insert pump runs into existing tubing, avoiding the workover cost that keeps these wells shut in.

03

Fit the existing platform

A 1.7 m × 1.7 m HPU, a ~5 T crane lift, and genset power where there's no grid supply.

FAQs

Offshore questions, answered.

Can HRP be used on offshore platforms?

Yes. The all-in-one HPU has a 1.7 m × 1.7 m footprint, lifts with a ~5 T platform crane, can drive two wells and can run on a genset, which makes it well suited to marginal and late-life offshore wells.

Does installation need a rig or a tubing pull?

No. A rod-retrievable insert pump anchors onto the existing tubing with a J-lock insert pump anchor. Future interventions only pull the rods and insert pump.

What if there's no grid power on the platform?

The HPU can be driven by an electric motor or an engine, and can run from a genset where there's no grid supply.

Can one power unit serve more than one well?

Yes. A single HPU can drive two wells.

What production rates can it handle?

10 to 1,500 BPD. Hybrid tubing/insert pumps reach up to 1,500 BPD, and double-displacement pumps add 30–35% without increasing size, load or SPM.

What about gas, solids and sand?

Specialty pumps handle high GLR and solids, and slotted intake screens keep sand out of the pump.

Have shut-in offshore wells?

Share a candidate well list and we'll come back with a lift design and an indicative package.

Contact HRP Australia